Coordinated Motion Planning: Reconfiguring a Swarm of Labeled Robots with Bounded Stretch

AI-generated keywords: Coordinated Motion Planning

AI-generated Key Points

The license of the paper does not allow us to build upon its content and the key points are generated using the paper metadata rather than the full article.

  • Breakthroughs in coordinated motion planning for reconfiguring a swarm of labeled convex objects
  • Objective is to achieve a desired target arrangement through parallel, continuous, collision-free translations
  • Previous research focused on sequential schedules, while authors propose constant-factor approximation algorithms for minimizing execution time
  • Algorithm achieves constant stretch factor with O(d) total duration if robots are within distance d from starting positions
  • Extensions include considering unlabeled robots and different classes of robots
  • Finding plan with minimal execution time is NP-hard even for grid arrangements without stationary obstacles
  • For densely packed disks that cannot be well separated, there exists a stretch factor of O(N^(1/2))
  • Advancements contribute to understanding of reconfiguring swarms and have potential applications in robotics and automation systems.
Also access our AI generated: Comprehensive summary, Lay summary, Blog-like article; or ask questions about this paper to our AI assistant.

Authors: Erik D. Demaine, Sándor P. Fekete, Phillip Keldenich, Henk Meijer, Christian Scheffer

32 pages, 20 figures

Abstract: We present a number of breakthroughs for coordinated motion planning, in which the objective is to reconfigure a swarm of labeled convex objects by a combination of parallel, continuous, collision-free translations into a given target arrangement. Problems of this type can be traced back to the classic work of Schwartz and Sharir (1983), who gave a method for deciding the existence of a coordinated motion for a set of disks between obstacles; their approach is polynomial in the complexity of the obstacles, but exponential in the number of disks. Other previous work has largely focused on {\em sequential} schedules, in which one robot moves at a time. We provide constant-factor approximation algorithms for minimizing the execution time of a coordinated, {\em parallel} motion plan for a swarm of robots in the absence of obstacles, provided some amount of separability. Our algorithm achieves {\em constant stretch factor}: If all robots are at most $d$ units from their respective starting positions, the total duration of the overall schedule is $O(d)$. Extensions include unlabeled robots and different classes of robots. We also prove that finding a plan with minimal execution time is NP-hard, even for a grid arrangement without any stationary obstacles. On the other hand, we show that for densely packed disks that cannot be well separated, a stretch factor $\Omega(N^{1/4})$ may be required. On the positive side, we establish a stretch factor of $O(N^{1/2})$ even in this case.

Submitted to arXiv on 05 Jan. 2018

Ask questions about this paper to our AI assistant

You can also chat with multiple papers at once here.

The license of the paper does not allow us to build upon its content and the AI assistant only knows about the paper metadata rather than the full article.

AI assistant instructions?

Results of the summarizing process for the arXiv paper: 1801.01689v1

This paper's license doesn't allow us to build upon its content and the summarizing process is here made with the paper's metadata rather than the article.

In this paper, the authors present several breakthroughs in coordinated motion planning for reconfiguring a swarm of labeled convex objects. The objective is to achieve a desired target arrangement by performing parallel, continuous, collision-free translations of the objects. This problem can be traced back to the classic work of Schwartz and Sharir in 1983, who provided a method for determining the existence of coordinated motion for a set of disks between obstacles. However, their approach has exponential complexity with respect to the number of disks. Previous research in this area has mainly focused on sequential schedules, where one robot moves at a time. In contrast, the authors propose constant-factor approximation algorithms for minimizing the execution time of a coordinated parallel motion plan for a swarm of robots in the absence of obstacles, assuming some level of separability. The algorithm developed by the authors achieves a constant stretch factor. Specifically, if all robots are within a distance d from their respective starting positions, the total duration of the overall schedule is O(d). The extensions include considering unlabeled robots and different classes of robots. Furthermore, the authors prove that finding a plan with minimal execution time is NP-hard even for grid arrangements without stationary obstacles. On the positive side, they establish that even for densely packed disks that cannot be well separated, there exists a stretch factor of O(N^(1/2)). Overall, this paper presents significant advancements in coordinated motion planning by providing efficient algorithms and analyzing their performance under various conditions. The results contribute to our understanding of reconfiguring swarms of labeled convex objects and have potential applications in robotics and automation systems.
Created on 07 Feb. 2024

Assess the quality of the AI-generated content by voting

Score: 0

Why do we need votes?

Votes are used to determine whether we need to re-run our summarizing tools. If the count reaches -10, our tools can be restarted.

Similar papers summarized with our AI tools

Navigate through even more similar papers through a

tree representation

Look for similar papers (in beta version)

By clicking on the button above, our algorithm will scan all papers in our database to find the closest based on the contents of the full papers and not just on metadata. Please note that it only works for papers that we have generated summaries for and you can rerun it from time to time to get a more accurate result while our database grows.

Disclaimer: The AI-based summarization tool and virtual assistant provided on this website may not always provide accurate and complete summaries or responses. We encourage you to carefully review and evaluate the generated content to ensure its quality and relevance to your needs.